MALAYSIA FUEL PRICES (PER LITRE)
26 NOV 2026 - 02 DEC 2026
PETRON BLAZE 95 EURO 4M
MARKET PRICE
BUDI95 PRICE

RM3.47
RM1.99
PETRON BLAZE 97 EURO 4M
RM3.75
PETRON BLAZE 100 EURO 4M
RM5.45
PETRON DIESEL MAX EURO 5
MARKET PRICE
BUDI DIESEL PRICE

RM4.47
RM2.10
PETRON TURBO DIESEL EURO 5
RM4.67

Petron Malaysia navigates volatile third quarter while the Port Dickson Refinery Jetty construction nears completion

Petron Malaysia navigates volatile third quarter while the Port Dickson Refinery Jetty construction nears completion

KUALA LUMPUR – Petron Malaysia Refining & Marketing Bhd (PMRMB) continued to navigate a volatile market amidst temporary operational constraints brought about by the unavailability of its refinery product jetty. PMRMB sustained, in a limited capacity, its refinery production to ensure supply stability of regulated products in the domestic market. With elevated supply costs emanating from the ongoing geopolitical tensions in the Middle East, coupled by the incremental costs to operate the refinery in the absence of the jetty, the Company recorded a net loss of RM109 million in the third quarter of 2026. However, its financial performance is expected to improve once the Company commissions its new product jetty by early 2027, allowing it to optimize refinery production and remove incidental operating costs.

From an average of $108 per barrel in May amidst the sharp decline of oil prices in the second quarter, the benchmark Dated Brent crude price dropped further to $83 per barrel in July before recovering to $117 per barrel in September, driven by expanded tensions in the Middle East war. The price volatility and the continued elevated crude and product premium added pressure on the Company’s profitability.

PMRMB’s Retail business posted a 2% volume growth through sales and network expansion initiatives, delivering 4.6 million barrels during the quarter versus the same period last year. While overall sales volume declined due to lower refinery production, revenue rose by 25% to RM4.3 billion from higher oil prices. However, the elevated supply costs and incidental production cost resulted in a gross loss of RM101 million during the quarter.

Nevertheless, PMRMB continued to effectively manage working capital and tighten selling and administrative expenses, which enabled the Company to sustain stable cash flow and financial position.

“We are making good progress in the construction of our new product jetty which will allow the Port Dickson Refinery to achieve its optimal operating level, and eliminate operating constraints and incidental costs. Throughout this challenging period, our focus remained on achieving operational resilience while managing market volatility to sustain a reliable supply of essential products to the domestic market,” said PMRMB Chairman Ramon S. Ang.

PMRMB remains committed to creating long-term value through the expansion of its retail network, the construction of its Port Dickson Palm Oil Methyl Ester (PME) plant, and continuous enhancement of its refining, supply and distribution operations.

(END)